Archived copy of the original 508pir.org site, preserved by Family and Friends of the 508th PIR Association. Visit 508thpir.org | Search this archive

Jump Into Darkness

Open the original PDF (porcella_01.pdf)

Text taken from the PDF.

Page 1

JUMP INTO DARKNESS

On 27 November 1942, Thomas W. Porcella enlisted in the
United States Army, volunteered for paratrooper duty and was inducted
at Whitehall Street, New York City. He was sent to Camp Upton, New
York and Camp Toccoa, Georgia, and then to Camp Blanding, Florida,
to be part of the Third Battalion of the 508th Parachute Infantry
Regiment. In Camp Blanding he received army basic training and
preparation for parachute school. At Fort Benning, Georgia, he
qualified as a parachutist, earning his Silver Wings in March 1944.
In April of 1943 the regiment was stationed at Camp Mackall,
North Carolina, for advanced military training. The 508th left for Camp
Shanks, New York, in preparation for overseas duty in December 1945.
The ship, (James Parker) safely delivered the 508th at Belfast harbor,
Northern Ireland in January 1944. March of 1944 found them in
Nottingham, England for final training before the invasion of
Normandy, France.
Upon his discharge in January, 1946, he was awarded the
following decorations: The Bronze Star, Purple Heart, Distinguished
Unit Emblem, American Campaign Medal, European-African-Middle
Eastern Campaign Medal, World War II Victory Medal and the Combat
Infantry Badge. Also Army of Occupation Medal, French Fourragere,
Belgian Fourragere and Netherlands Orange Lanyard.

- 1 This material is the sole property of Thomas W. Porcella. It is not to
be sold, reproduced or generally distributed without written consent.

Page 2

JUMP INTO DARKNESS

Your contribution to war literature by
describing combat from the level of a front
line infantry soldier, who bears the brunt of
battle, will be refreshing and welcome.
General M.B. Ridgway

- 2 This material is the sole property of Thomas W. Porcella. It is not to
be sold, reproduced or generally distributed without written consent.

Page 3

JUMP INTO DARKNESS

ACKNOWLEDGEMENTS

I wish to express my appreciation to my wife Molly and to my
daughters, Christine and Mary, for their cooperation in the writing of
this book. Without their help it could not have been possible for me; to
put my stories in print.
My thanks to Joe Madden who spent many days researching
material in the National Archives, Washington, D. C.

- 3 This material is the sole property of Thomas W. Porcella. It is not to
be sold, reproduced or generally distributed without written consent.

Page 4

JUMP INTO DARKNESS

21 Jun 80.
Dear Porcella,
I appreciate your letter, and most of all the service we shared in
WW II in Europe from England to the Baltic, with the epic D-Day drop
into Normandy.
You have my permission to use the quotations from my book:
SOLDIER, though if they much exceed fifty words, it might be well to
ask the permission of Harper & Row of New York, the successor to the
publisher, Harper & Brothers. I am sure its permission would be
granted.
Your contribution to war literature, by describing combat from
the level of the front line infantry soldier, who bears the brunt of battle,
will he refreshing and welcome.
With best wishes,
Sincerely/
signed/ M. B. Ridgway

M. B. Ridgway
Mr. Tom Porcella
17 Westwood Road South
Massapequa, New York
11762

P.S. If I have misspelled your
name, I apologize. I can not be sure if the
ending is an “a”, or “ci”
initialed / M.B.R

- 4 This material is the sole property of Thomas W. Porcella. It is not to
be sold, reproduced or generally distributed without written consent.

Page 5

JUMP INTO DARKNESS

JUMP INTO DARKNESS, and the ensuing battles, have been forever etched
in the minds of those who survived. I have written what I can remember of
my experiences in the swamps, fields and hedgerows. My writings are
dedicated to those who are no longer with us to tell their part in the invasion
of Normandy.

- 5 This material is the sole property of Thomas W. Porcella. It is not to
be sold, reproduced or generally distributed without written consent.

Page 6

JUMP INTO DARKNESS
PRELUDE
Many months of planning and preparation preceded the 6 June 1944 D-Day landings in Normandy.
Beginning in March of 1944 Allied Air Forces disrupted transportation between the Seine and Loire rivers
and conducted strategic air bombardment deep into enemy territory, in an attempt to keep the German Air
Force occupied and on the defensive and to isolate the landing areas.
On 6 June 1944 during the early morning hours of darkness, three airborne divisions, the British 6th,
and the United States 82nd and 101st, were dropped to the rear of the beach area to cover deployment of
the seaborne assault forces. Simultaneously, allied naval forces swept the English Channel of mines and
preceded the assault vessels to the landing areas. At 6:30 a.m. under cover of intense naval and air
bombardment, six U.S, British and Canadian divisions began landing on Utah, Omaha, Gold, Juno, and
Sword beaches in what was to be the greatest amphibious assault in recorded history.
The U.S 4th division landed at Utah beach and pushed rapidly- inland to join the Airborne divisions.
The early success and light casualties or, Utah beech contrasted sharply with the difficulties of the U.S, 1st
and 29th divisions on Omaha beach to the East, where the enemy was resisting with every device and
weapon at his disposal. Its terrain alone was a major obstacle. Instead of sloping to the East, the beach area
terminated in precipitous steep sandy bluffs. Troops had to cross an open area varying in width from a few
yards at each end to about 200 yards in the center, and then attack up the steep bluffs to the plateau where
the Normandy American Cemetery now stands. The only concealment available was patches of tall marsh
grass. Fighting was bitter and casualties [were] heavy. Nevertheless, the U.S 1st division took the high
ground before D Day was over.

- 6 This material is the sole property of Thomas W. Porcella. It is not to
be sold, reproduced or generally distributed without written consent.

Page 7

JUMP INTO DARKNESS
OPERATION NEPTUNE NORMANDY
The 82nd Airborne Division arrived. in the European Theater of Operations on 9 December, 1945,
bronzed by the summer suns of North Africa and Sicily and bled and battle tested in campaigns in Sicily
and the Italian mainland. One Regimental Combat team, the 504th, had been left behind when the division
sailed from Naples, Italy on 19 November 1943.
The 504th Regimental Combat team, (consisting of the 504th Parachute Infantry, the 376th
Parachute field, artillery battalion, and Company C, 307th Airborne Engineer Battalion) was detached from
the division and was fighting in the mountains North of the Volturno River, when the 82nd sailed from
Naples. Later it was to spend more than 60 days of grueling warfare on the famous Anzio beachhead before
rejoining the division in May in England.
The division disembarked at Belfast, Northern Ireland, and occupied an area northwest of that city.
Division Headquarters was established at Castle Dawson, which was approximately thirty miles from
Belfast. The Division was attached to XV Corps.
By 26 May 1944 all plans and preparations were completed, for the Division to carry out the
mission. Assigned it by First United States Army. Field and administrative orders had been published and
distributed. In a series of map maneuvers on a special 1/5,000 map regimental and battalion commanders
had out-lined their plans in order that all commanders might be briefed thoroughly on the prospective
Division operations. Divisional seaborne echelons already had departed for the marshalling yards and were
assembled in camps scattered along the Welsh and English coasts, The Division mission was to be as
follows;
Land by parachute and glider before and after dawn of D-Day west of
ST. SAUVEUR LE VICOMTE: seize, clear and secure the general
area ST. JACQUES DE NEHOU -- BESNEVIILE -- ST. SAVEUR
LE VICOMTE -- BLANDAMOUR and reorganize; seize and destroy
the crossings of the PRAIRIES MARECAGEUSES north of LA
SANGSURIERE at ST. SAUVEUR DE PIERRE PONT; destroy the
crossings of the OLLOMONDE river in the vicinity of ST. LO
D'OURVILLE and block crossroads vicinity LE CHEMIN; prevent
enemy forces moving north between ST. LO D'OURVILLE and
junction of DOUVE river with PRAIRIE MARECAGEUSES; and
protect the south flank of VII corps north of the same line.
The mission, however, was changed by the First Army
Commander on 26 May due to confirmed intelligence reports that the
enemy had strengthened his forces on the COTENTIN,
(CHERBOURG) peninsula with the addition of the 91st Infantry
division in the general area of ST. SAUVEUR LE VICOMTE.

- 7 This material is the sole property of Thomas W. Porcella. It is not to
be sold, reproduced or generally distributed without written consent.

Page 8

JUMP INTO DARKNESS
The revised mission of the 82nd Airborne division was to be:
Land by parachute and glider before and after dawn of D-Day astride
the Merderet river, seize, clear and secure the general area NEUVILLE
AU PLAIN, BANDIENVILLE within its zone; capture ST. MERE
EGLISE; seize and secure the crossings of the MERDERET river and
a bridgehead covering them, with main line of resistance along the
general line. Seize and destroy the crossings of the DOUVE river at
BEUZEVILLE LA BASTILLE and ETIENVILLE (also known as
PONT L'ABBE): protect the northwest flank of VII corps within the
Division zone, and be prepared to advance west on Corps order to the
line of the DOUVE north of its junction with the PRAIRIES
MARECAGEUSES.
New orders and other administrative details made necessary by the new mission were worked out
quickly and disseminated within four days. The change did not affect the basic plan for movement in three
echelons, which had been worked out as follows;
A shortage of adequate training facilities, the short days and long nights, and no facilities at all for
airborne maneuvers, handicapped training. The need for such facilities and training became increasingly
important, with the attachment to the division on. 14 January 1944, of the 2nd Airborne Brigade, which
included the Brigade Headquarters Company and the 507th and 508th Parachute Infantry Regiments, and
preparations were made for the 82nd to move to the Nottingham - Leicester - Market Harboro area in the
English Midlands. Brig. Gen. Maxwell B. Taylor, Division Artillery Commander, rejoined the Division
after duty with the North African Theater of Operations.
The move to the midlands was made in mid-February 1944, and an extensive program of airborne
and other types of training was begun. A parachute school was opened to train reinforcements, and a series
of parachute problems was mapped out to begin with battalion drops and to culminate with a. drop of three
regiments. Glider personnel trained with the British Horsa gliders as well as with the CG-4A (Waco)
gliders, took training rides of more than two hours duration.
Division Headquarters was established in a hutted camp in Braunstone Park, Leicester. The
telephone code names of 'Leader' and ''Keystone', employed by the Division in forth Africa, Sicily and
Italy, were dropped and the Division became known as “Champion”. The 456th Parachute Field Artillery
Battalion, which had seen much of its personnel detached and left in Italy, was reorganized. The 2nd
Battalion Glider Infantry, 101st Airborne Division, was attached to the 325th Glider Infantry. This move
gave the 325th a total of three battalions. Brigadier General Taylor left the Division to become
Commanding General of the 101st Airborne Division. The Division was attached to VIII Corps.
Meanwhile, preparations were being made for the Division's participation in the invasion of the
Normandy France, peninsula by Allied forces in '^Operation Neptune'. Brigadier General James M. Gavin
the assistant Division Commander had preceded the Division on its move from Italy and had been a
member of the Airborne planning- staff established by the Allies in London. The Division staff began
preliminary planning work. in January and started intensive planning in February, when the Division.
Situation room was opened at Camp Braunstone. The Division Commander, Major General Matthew B.
Ridgway, was the senior American Airborne representative on an inter-Allied airborne planning committee.
“Y-Day", the day by which all plans were to be completed, had been set by Supreme Headquarters
Allied Expeditionary Force, as 1 June. Regimental staffs were '"briefed' on Y-60 and battalion staffs or. Y30 in accordance with instructions received from the First United States Army and VII Corps, to which the
Division would be attached upon landing.

- 8 This material is the sole property of Thomas W. Porcella. It is not to
be sold, reproduced or generally distributed without written consent.

Page 9

JUMP INTO DARKNESS
AIR MOVEMENT TABLES
A/Borne
unit
82nd Pathfinders
82nd Pathfinders
82nd Pathfinders

USTCC
unit

No.
A/C

1st PF
1st PF
1st PF

3
3
3

Takeoff
airfield
N. Witham
N. Witham
N. Witham

DZ
DZ Time
O
N
T

0121
0138
0202

MISSION "BOSTON" D-DAY
2 Bn 505 Prcht Inf
3 Bn 505 Prcht Inf
2 secs. 456 Prcht FA
1 Bn 505 Prcht Inf
HQ & HQ Co. 505
Plat 3-7 Abn Engr Bn
Det. Hq 82 Abn Div
2 Bn 508 Prcht Inf
Hq & Hq Co 508
Co. B 307 Engr
Force 'A' Hq
1 Bn 508. Prcht Inf
3 Bn 508 Prcht Inf
2 Bn 507 Prcht Inf
3 Bn 507 Prcht Inf
1 Bn 507 Prcht Inf
Hq &. Hq Co. 507

316 Gp
316 Gp

36
36

Cottesmore
Cottesmore

O
O

0151
0157

315 Gp

36
9

Spanhoe

O

0203

Saltby

N

0208

Saltby

N

0214

Folkingham
Folkingham
Barkston Heath
Barkston Heath
Fulbeck
Fulbeck

N
N
T
T
T
T

0220
0226
0231
0238
0244
0244

3
314 Gp
314 Gr

313 Gp
313 Gp
61 Gp
61 Gp
442 Gp
442 Gp

36
9
6
9
36
36
36
36
36
9

Force "A" commanded by Brigadier General James M. Gavin, Assistant Division
Commander, to be committed by parachute before dawn of D-Day and to include:
Planes
Detachment Headquarter and Headquarter Co
4
82nd Airborne Division Pathfinders
9
Detachment Headquarter Division Artillery
2
Detachment 82nd Airborne Signal Corps
3
Detachment 456 Parachute Field Artillery Battalion (Attached 505
Parachute Infantry)
Air Support Party (Attached Headquarter 82nd Airborne Division)
505 Parachute Infantry
117
507 Parachute Infantry
117
508 Parachute Infantry
117
Company B, 307 Airborne Engineer Battalion
9
Naval Shore Fire Control Party (Attached 505 Parachute Infantry)
TOTAL
378

- 9 This material is the sole property of Thomas W. Porcella. It is not to
be sold, reproduced or generally distributed without written consent.

Page 10

JUMP INTO DARKNESS
Force "B" commanded by Major General Matthew B. Ridgway, Division
Commander, to be committed by glider before and after dawn of D-Day and to
include:
Gliders
Headquarter and Headquarter Company
22
82nd Airborne Division Headquarter and Headquarter Battery
11
82nd Airborne Division Artillery
82nd Airborne Signal Company
13
325 Glider Infantry
172
319 Glider Field Artillery Battalion
40
320 Glider Field Artillery Battalion
54
Batteries A, B and C, 80th Airborne Anti-Aircraft Battalion
57
Company A, 307 Airborne Engineer Battalion
10
307 Airborne Medical Company
20
82nd Airborne
4
Command Vehicles - Parachute Regiments
12
TOTAL
428

Force "C" commanded by Brigadier General George P. Howell, Commanding General of 2nd Airborne
Infantry Brigade, to be committed by sea, to land between June 8 and June 13 and to include:
456 Field Artillery Battalion
80th Airborne Anti Aircraft Battalion
307 Airborne Engineer Battalion
782 Airborne Ordinance Maintenance Company
407 Airborne Quarter Master Company
82nd Airborne Military Police Platoon
Corps Medical Detachment
87th Armored Field Artillery Battalion
899 Tank Destroyer Battalion
Troop B, 4 Cavalry Squadron
Company C, 746 Tank Battalion (M)
3809 Quarter Master Truck Company
3810 Quarter Master Truck Company
1st Platoon, 603 Quarter Master Company

- 10 This material is the sole property of Thomas W. Porcella. It is not to
be sold, reproduced or generally distributed without written consent.

Page 11

JUMP INTO DARKNESS
Seaborne Elements of Units in Forces "A" and "B"
Under the plan Force "A" in its entirety was to approach the Cherbourg Peninsula from the west and
to drop between 0100 and 0315 hours on the night before D-Day on three-drop zones. The 505th
Parachute Infantry Regiment and its attachments were to land east of the Merderet River about 1,000
yards northwest of Ste. Mere Eglise. The 507th Parachute Infantry Regiment was to land west of the
Merderet River about 1,000 yards north to Amfreville. The 508th Parachute Infantry Regiment and
Force "A" Headquarters were to land west of the Merderet River about 1,000 yards north of Picauville.
Fifty-two gliders of Force "B" were to approach the Cherbourg Peninsula from the west prior to HHour and land on the 505th drop zone. The remainder of Force "B" was to approach the peninsula from the
east and was to land late on D-Day and early on 7 June, on landing zones astride the Ste. Mere Eglise Blosville Road. In a last minute change of plan General Ridgway parachuted with Force "A".
Aerial resupply missions were scheduled automatically for the morning of 7 June and on call
thereafter if needed. The automatic mission was the only parachute mission ultimately flown but a small
amount of equipment and supplies were received later by glider.
All airborne elements of the Division had closed and were sealed in special camps at the takeoff
fields by twenty-four hours before the scheduled takeoff time. Parachute elements were located at seven
airfields in the Grantham-Cottesmore-Langar area of the British Midlands, and glider elements were at
seven airfields in the Aldermaston - Ramsbury - Merryfield area.
All men were briefed thoroughly on their missions, a re-check was made of all equipment and
personnel, and planes and gliders were loaded with equipment. The Allied D-Day was postponed twentyfour hours because of weather conditions, and the first planes of Force "A" took off 5 June 1944.
The main flight was preceded by the three regimental pathfinder teams which dropped one-half hour
prior to the first group. The path- finders sustained many casualties and had difficulty in using lights, but
they accomplished their mission and set up beacons to guide the incoming planes to the three designated
drop zones.
The flight over the English Channel was in good formation and ^without incident, but between the
west coast and the drop zones a heavy fog bank tended to break up the formation of the planes. Flak and
some enemy night fighters activity caused some of the troop carrier planes to take up evasive action, and by
the time the drop zones were reached many planes were scattered, and were flying at excessive speeds and
at altitudes higher than those ideal for jumping.
The 505th Parachute Infantry Regiment landed generally in the vicinity of its drop zone. The 507th
Parachute Infantry was scattered, one element dropping in the vicinity of Montebourg, another south of
Carentan and the remainder astride the Merderet River east of the drop zone.
The 508th Parachute Infantry Regiment was likewise scattered widely, the bulk of its parachutists
dropping east of the drop zone and some personnel landing so far away as nine kilometers south of
Cherbourg.
The fifty-two gliders containing batteries of the 80th Airborne Anti-aircraft Battalion and
detachments and forward parties of Artillery, Signal and Division Headquarters groups followed the main
body of paratroopers and began landing at 0404 hours. The gliders also en- countered fog and flak. They
too were scattered, and many of them were damaged upon crashing into the small fields and high
hedgerows.
Enemy reaction to the landing of the 82nd Airborne Division in the Normandy area was prompt and
severe, but from the time the first member landed until thirty-three days later, when the Division was
finally relieved, every mission was accomplished and no ground gained was ever relinquished.

- 11 This material is the sole property of Thomas W. Porcella. It is not to
be sold, reproduced or generally distributed without written consent.

Page 12

JUMP INTO DARKNESS

- 12 This material is the sole property of Thomas W. Porcella. It is not to
be sold, reproduced or generally distributed without written consent.

Page 13

JUMP INTO DARKNESS
SUMMARY
82nd AIRBORNE DIVISION
The first element of the main body of the Division jumped at
0151 hours, having been preceded thirty minutes by the Pathfinder
teams. By 0312 hours all paratroopers had landed, and at 0404 hours
the first of fifty-two gliders in the initial glider serial crash landed.
Both parachutists and gliders were scattered.
Small groups and some units attacked to secure the Division
zone. Groups of men and individuals who had been scattered in the
landings rejoined their units throughout the day and by nightfall
approximately thirty percent of the Division's forces were under
control.
At 2100 hours one hundred gliders landed with artillery,
engineers, and special troops. Seaborne elements set sail at 0645 from
Bristol except for a task force consisting of Company C, 746th Tank
Battalion; the 1st Platoon, Troop B, 4th Cavalry Squadron; and
elements of Company F, 3rd Battalion (originally 2nd Battalion, 401st
Glider Infantry), 325th Glider Infantry. This task force landed on Utah
Red Beach at 1400 hours and proceeded inland with the mission of
contacting the Division near Ste. Mere Eglise.
At the close of the day, the Division was in the midst of severe
fighting. It had captured Ste. Mere Eglise and held a general line along
the Merderet River from La Fiere south to include the eastern end of
the causeway over the Merderet River.

- 13 This material is the sole property of Thomas W. Porcella. It is not to
be sold, reproduced or generally distributed without written consent.